| Company | Project | Region | Technology | Capital Expenditures | Production (bbl/d) |
|---|---|---|---|---|---|
| Alberta Oilsands Inc. | Clearwater West/East Commercial Project | Athabasca | In-Situ | $350M all phases | 25,000 |
| Regulatory Status Announced | Start Up 2013 | ||||
| Alberta Oilsands Inc. | Clearwater - Pilot | Athabasca | In-Situ | $350M all phases | 2,000 |
| Regulatory Status Regulatory Application Filed | Start Up 2010/11 | ||||
| Canadian Natural Resources Limited | Primrose and Wolf Lake | Cold Lake | In-Situ | N/A | 120,000 |
| Regulatory Status Producing | Start Up 1985 | ||||
| Chevron Canada Limited | Ells River | Athabasca | In-Situ | N/A | 35,000 |
| Regulatory Status Announced (Not Formalized) | Start Up TBA | ||||
| Connacher Oil and Gas | Great Divide Expansion Project | Athabasca | In-Situ | $875M | 24,000 |
| Regulatory Status Public Disclosure Made | Start Up 2014 | ||||
| Connacher Oil and Gas | Great Divide Pod 2 (Algar) | Athabasca | In-Situ | $350M | 10,000 |
| Regulatory Status Under Construction | Start Up 2010 | ||||
| ConocoPhillips Canada | Surmont Phase I | Athabasca | In-Situ | N/A | 27,000 |
| Regulatory Status Producing | Start Up 2008 | ||||
| ConocoPhillips Canada | Surmont Phase II | Athabasca | In-Situ | $2,625M | 83,000 |
| Regulatory Status ERCB Approved | Start Up 2014-2016 | ||||
| Devon Canada Limited | Jackfish I | Athabasca | In-Situ | N/A | 35,000 |
| Regulatory Status Producing | Start Up 2007 | ||||
| Cenovus Energy Inc. | Christina Lake Ph. 1A, 1B | Athabasca | In-Situ | N/A | 18,800 |
| Regulatory Status Producing | Start Up 2002 | ||||
| Cenovus Energy Inc. | Christina Lake 1C | Athabasca | In-Situ | $1,400M | 40,000 |
| Regulatory Status Under Construction | Start Up 2010 | ||||
| Cenovus Energy Inc. | Christina Lake 1D | Athabasca | In-Situ | $1,400M | 40,000 |
| Regulatory Status ERCB Approved | Start Up 2013 | ||||
| Cenovus Energy Inc. | Christina Lake 1E-F-G | Athabasca | In-Situ | $2,100M | 120,000 |
| Regulatory Status Regulatory Application Filed | Start Up 2013-2016 | ||||
| Enerplus Resource Fund | Kirby Phase 1 | Athabasca | In-Situ | $350M | 10,000 |
| Regulatory Status Regulatory Application Filed | Start Up TBD | ||||
| Grizzly Oil Sands | Algar Lake | Athabasca | In-Situ | N/A | 10,000 |
| Regulatory Status Regulatory Application Filed | Start Up 2013 | ||||
| Husky Energy | Caribou Lake Thermal Demonstration Project | Cold Lake | In-Situ | N/A | 10,000 |
| Regulatory Status Approved | Start Up TBD | ||||
| Husky Energy | Sunrise Thermal Project Ph. 1-3 | Athabasca | In-Situ | $5,000M | 200,000 |
| Regulatory Status ERCB Approved | Start Up 2014-2018 | ||||
| Husky Energy | Tucker Thermal Project | Cold Lake | In-Situ | N/A | 30,000 |
| Regulatory Status Producing | Start Up 2006 | ||||
| Ivanhoe Energy | Tamarack | Athabasca | In-Situ | $1,250M | 20,000 |
| Regulatory Status Announced | Start Up 2014 | ||||
| Japan Canada Oil Sands Limited | Hangingstone Pilot | Athabasca | In-Situ | N/A | 10,000 |
| Regulatory Status Producing | Start Up 1999 | ||||
| Japan Canada Oil Sands Limited | Hangingstone Phase 1 | Athabasca | In-Situ | $875M | 35,000 |
| Regulatory Status Public Disclosure Made | Start Up 2013 | ||||
| Laricina Energy | Germain Pilot | Athabasca | In-Situ | N/A | 1,800 |
| Regulatory Status Regulatory Application Filed | Start Up TBD | ||||
| Laricina Energy | Saleski Phase 1 | Athabasca | In-Situ | N/A | 10,000 |
| Regulatory Status ERCB Approved | Start Up TBD | ||||
| MEG Energy Corp. | Christina Lake Regional Project Phase 1A | Athabasca | In-Situ | N/A | 3,000 |
| Regulatory Status Producing | Start Up 2008 | ||||
| MEG Energy Corp. | Christina Lake Regional Project Phase 2 | Athabasca | In-Situ | $770M | 20,000 |
| Regulatory Status Under Construction/Near Completion | Start Up 2009 | ||||
| MEG Energy Corp. | Christina Lake Regional Project Phase 2B | Athabasca | In-Situ | $6,475M Ph. 2B-3C | 35,000 |
| Regulatory Status Regulatory Application Filed | Start Up 2013 | ||||
| Nexen Inc. | Long Lake Phase III Upgrader | Athabasca | In-Situ | $4,900M | 72,000 |
| Regulatory Status ERCB Approved (Delayed) | Start Up TBD | ||||
| Patch Energy | Ells River | Athabasca | In-Situ | N/A | 10,000 |
| Regulatory Status Announced | Start Up TBD | ||||
| Suncor Energy Inc. | Fort Hills | Athabasca | Mining | $11,400M | 190,000 |
| Regulatory Status ERCB Approved (Delayed) | Start Up TBD | ||||
| Suncor Energy Inc. | Lewis Phase 1 | Athabasca | In-Situ | N/A | 40,000 |
| Regulatory Status Public Disclosure Made | Start Up TBD | ||||
| Suncor Energy Inc. | Meadow Creek Phase 1 | Athabasca | In-Situ | $2,800M | 80,000 |
| Regulatory Status Announced | Start Up TBD | ||||
| Shell Canada Energy | Muskeg River Phase 1 | Athabasca | Mining | N/A | 155,000 |
| Regulatory Status Producing | Start Up 2003 | ||||
| Shell Canada Energy | Pierre River Mine Phase 1 & 2 | Athabasca | Mining | N/A | 200,000 |
| Regulatory Status Regulatory Application Filed | Start Up 2018-2022 | ||||
| Shell Canada Energy | Carmon Creek | Peace River | In-Situ | N/A | 80,000 |
| Regulatory Status Regulatory Application Filed | Start Up TBD | ||||
| Shell Canada Energy | Shell Peace River (Pads 42&43) | Peace River | In-Situ | N/A | 0 |
| Regulatory Status Producing | Start Up NA | ||||
| Southern Pacific Resource Corp. | STP MacKay Project | Athabasca | In-Situ | N/A | 12,000 |
| Regulatory Status Regulatory Application Filed | Start Up 2013 | ||||
| Statoil Canada Ltd. | Kai Kos Dehseh - Leismer Demo | Athabasca | In-Situ | $350M | 10,000 |
| Regulatory Status Under Construction | Start Up 2011 | ||||
| Suncor Energy Inc. | Base Plant, Steepbank Mine, Millennium | Athabasca | Mining | N/A | 350,000 |
| Regulatory Status Producing | Start Up 1967 | ||||
| Suncor Energy Inc. | Firebag Phase III | Athabasca | In-Situ | $2,244M | 68,000 |
| Regulatory Status Under Construction | Start Up 2011 | ||||
| Suncor Energy Inc. | Firebag Phase IV - VI | Athabasca | In-Situ | $7,000M | 211,000 |
| Regulatory Status Regulatory Application Filed | Start Up TBD | ||||
| Suncor Energy Inc. | North Steepbank Mine Expansion | Athabasca | Mining | $11,500M | 180,000 |
| Regulatory Status Suspended/Under Construction | Start Up TBA | ||||
| Suncor Energy Inc. | Voyageur South Mine | Athabasca | Mining | $7,200M | 120,000 |
| Regulatory Status Regulatory Application Filed | Start Up TBA | ||||
| Suncor Energy Inc. | Voyageur Upgrader | Athabasca | Mining | $11,500M | N/A |
| Regulatory Status Suspended/Under Construction | Start Up TBD | ||||
| Sunshine Oil Sands | Legend Lake Phase 1-3 | Athabasca | In-Situ | N/A | 50,000 |
| Regulatory Status Announced | Start Up 2014 | ||||
| Sunshine Oil Sands | West Ells Phases 1-3 | Athabasca | In-Situ | N/A | 80,000 |
| Regulatory Status Announced | Start Up TBD | ||||
| Syncrude Canada Ltd. | Aurora North | Athabasca | Mining | N/A | 215,000 |
| Regulatory Status Producing | Start Up 2001 | ||||
| Syncrude Canada Ltd. | Aurora South | Athabasca | Mining | $12,000M | 200,000 |
| Regulatory Status ERCB Approved | Start Up 2016-2019 | ||||
| Syncrude Canada Ltd. | Mildred Lake | Athabasca | Mining | N/A | 135,000 |
| Regulatory Status Producing | Start Up 1978 | ||||
| Total E&P | Joslyn North Mine | Athabasca | Mining | $6,000M | 100,000 |
| Regulatory Status Regulatory Application Filed | Start Up TBA | ||||
| Total E&P | Joslyn South Mine | Athabasca | Mining | N/A | 100,000 |
| Regulatory Status Announced | Start Up TBA | ||||
| UTS Energy/Teck Cominco | Equinox | Athabasca | Mining | $3,000M | 50,000 |
| Regulatory Status Announced | Start Up TBA | ||||
| Canadian Natural Resources Limited | Horizon Phase I | Athabasca | Mining | N/A | 135,000 |
| Regulatory Status Producing | Start Up 2008 | ||||
| Canadian Natural Resources Limited | Horizon Phase IV and V | Athabasca | Mining | N/A | 300,000 |
| Regulatory Status Announced (Not Formalized) | Start Up 2015-2017 | ||||
| Canadian Natural Resources Limited | Horizon Phase II and III | Athabasca | Mining | $14,300M | 135,000 |
| Regulatory Status Announced (Not Formalized) | Start Up 2013 | ||||
| Shell Canada Energy | Jackpine Mines Phase I Train I | Athabasca | Mining | $6,000M | 100,000 |
| Regulatory Status Under Construction | Start Up 2010 | ||||
| Shell Canada Energy | Jackpine Mines Phase I Train II | Athabasca | Mining | $6,000M | 100,000 |
| Regulatory Status Approved | Start Up 2014 | ||||
| Shell Canada Energy | Jackpine Mine Expansion | Athabasca | Mining | $18,000M | 100,000 |
| Regulatory Status Regulatory Application Filed | Start Up TBA | ||||
| Imperial Oil | Kearl Phase I | Athabasca | Mining | $20,000M (3 phases) | 100,000 |
| Regulatory Status Under Construction | Start Up 2012 | ||||
| Imperial Oil | Kearl Phase III | Athabasca | Mining | $20,000M (3 phases) | 100,000 |
| Regulatory Status ERCB Approved | Start Up 2021 | ||||
| Imperial Oil | Kearl Phase II | Athabasca | Mining | $20,000M (3 phases) | 100,000 |
| Regulatory Status ERCB Approved | Start Up 2015 | ||||
| Petrobank Energy & Resources Ltd. | Whitesands - Pilot | Athabasca | In-Situ | N/A | 1,900 |
| Regulatory Status Producing | Start Up 2006 | ||||
| Value Creation | Halfway Cr. Demo | Athabasca | In-Situ | N/A | 10,000 |
| Regulatory Status Regulatory Application Filed | Start Up 2010 | ||||
| UTS Energy/Teck Cominco | Frontier Phase 1 & 2 | Athabasca | Mining | $9,600M | 160,000 |
| Regulatory Status Announced | Start Up TBA | ||||
| Devon Canada Limited | Jackfish 3 | Athabasca | In-Situ | N/A | 35,000 |
| Regulatory Status Public Disclosure Made | Start Up 2015 | ||||
| Cenovus Energy Inc. | Foster Creek Phases 1A-1E | Cold Lake | In-Situ | N/A | 120,000 |
| Regulatory Status Producing | Start Up 2001-2009 | ||||
| Husky Energy | McMullen | Athabasca | In-Situ | N/A | 755 |
| Regulatory Status Regulatory Application Filed | Start Up TBD | ||||
| Koch Exploration Canada | Gemini | Cold Lake | In-Situ | N/A | 10,000 |
| Regulatory Status Regulatory Application Filed | Start Up 2012 | ||||
| Penn West Energy Trust | Seal Project | Peace River | In-Situ | N/A | 75 |
| Regulatory Status Regulatory Application Filed | Start Up TBD | ||||
| Suncor Energy Inc. | Firebag Phases 1 & 2 & Cogeneration and Expansion | Athabasca | In-Situ | N/A | 93,000 |
| Regulatory Status Producing | Start Up 2004-2007 | ||||
| Suncor Energy Inc. | Lewis Phase 2 | Athabasca | In-Situ | N/A | 40,000 |
| Regulatory Status Announced | Start Up TBD | ||||
| Sunshine Oil Sands | Harper Pilot | Athabasca | In-Situ | N/A | <1000 |
| Regulatory Status Approved | Start Up 2010 | ||||
| Sunshine Oil Sands | Thickwood Phases 1-3 | Athabasca | In-Situ | N/A | 75,000 |
| Regulatory Status Announced | Start Up TBD | ||||
| Canadian Natural Resources Limited | Grouse Phase 1 | Athabasca | In-Situ | N/A | 60,000 |
| Regulatory Status Announced | Start Up 2014 | ||||
| Canadian Natural Resources Limited | Leismer Phase 1 | Athabasca | In-Situ | N/A | 30,000 |
| Regulatory Status Announced | Start Up 2018 | ||||
| Andora Energy | Sawn Lake | Peace River | In-Situ | N/A | 700 |
| Regulatory Status Approved | Start Up N/A | ||||
| Athabasca Oil Sands Corp. | MacKay River Pilot | Athabasca | In-Situ | N/A | 2,200 |
| Regulatory Status Regulatory Application Filed | Start Up 2010 | ||||
| Athabasca Oil Sands Corp. | MacKay River Commercial Project Ph. 1-4 | Athabasca | In-Situ | N/A | 140,000 |
| Regulatory Status Public Disclosure Made | Start Up 2014-2022 | ||||
| Athabasca Oil Sands Corp. | Dover Central Pilot | Athabasca | In-Situ | N/A | 2,000 |
| Regulatory Status Regulatory Application Filed | Start Up N/A | ||||
| Athabasca Oil Sands Corp. | Dover Commercial Phase 1-4 | Athabasca | In-Situ | N/A | 140,000 |
| Regulatory Status Public Disclosure Made | Start Up 2016-2024 | ||||
| BlackPearl Resources Inc. | Blackrod - Pilot | Athabasca | In-Situ | N/A | 500 |
| Regulatory Status Regulatory Application Filed | Start Up 2011 | ||||
| Canadian Natural Resources Limited | Kirby | Athabasca | In-Situ | $1,575M | 45,000 |
| Regulatory Status Regulatory Application Filed | Start Up 2013 | ||||
| Canadian Natural Resources Limited | Birch Mountain East | Athabasca | In-Situ | N/A | 60,000 |
| Regulatory Status Announced | Start Up 2016 | ||||
| Canadian Natural Resources Limited | Gregoire Lake Phase 1 | Athabasca | In-Situ | N/A | 60,000 |
| Regulatory Status Announced | Start Up 2018 | ||||
| Connacher Oil and Gas | Great Divide Pod One | Athabasca | In-Situ | N/A | 10,000 |
| Regulatory Status Producing | Start Up 2007 | ||||
| Devon Canada Limited | Jackfish 2 | Athabasca | In-Situ | $1,225M | 35,000 |
| Regulatory Status Under Construction | Start Up 2011 | ||||
| Cenovus Energy Inc. | Borealis Phase 1 | Athabasca | In-Situ | $1,225M | 35,000 |
| Regulatory Status Regulatory Application Filed | Start Up TBD | ||||
| Cenovus Energy Inc. | Borealis Phase 2 & 3 | Athabasca | In-Situ | N/A | 65,000 |
| Regulatory Status Public Disclosure Made | Start Up TBD | ||||
| Cenovus Energy Inc. | Narrows Lake Phases 1-3 | Athabasca | In-Situ | $2,400M | 130,000 |
| Regulatory Status Public Disclosure Made | Start Up TBD | ||||
| Cenovus Energy Inc. | Foster Creek Phases 1F-1H | Cold Lake | In-Situ | N/A | 90,000 |
| Regulatory Status Regulatory Application Filed | Start Up 2015-2017 | ||||
| Enerplus Resource Fund | Kirby Phase 2 | Athabasca | In-Situ | N/A | 25,000 |
| Regulatory Status Announced (Not Formalized) | Start Up TBD | ||||
| E-T Energy | Poplar Creek ET-DSP Project Expansion | Athabasca | In-Situ | N/A | 100,000 |
| Regulatory Status Announced | Start Up 2014 | ||||
| E-T Energy | Poplar Creek ET-DSP Project | Athabasca | In-Situ | N/A | 10,000 |
| Regulatory Status Regulatory Application Filed | Start Up 2011 | ||||
| Excelsior Energy | Hangingstone Build out 1-3 | Athabasca | In-Situ | N/A | 80,000 |
| Regulatory Status Announced | Start Up TBD | ||||
| Excelsior Energy | Hangingstone Experimental Pilot | Athabasca | In-Situ | N/A | 1,000 |
| Regulatory Status Regulatory Application Filed | Start Up 2011 | ||||
| Imperial Oil | Cold Lake Phases 1-10:Leming, Maskwa, Mahihkan | Cold Lake | In-Situ | N/A | 110,000 |
| Regulatory Status Producing | Start Up 1985 | ||||
| Imperial Oil | Cold Lake Phases 11-13:Mahkeses | Cold Lake | In-Situ | N/A | 30,000 |
| Regulatory Status Producing | Start Up 2003 | ||||
| Shell Canada Energy | Orion Phase 1 | Cold Lake | In-Situ | N/A | 10,000 |
| Regulatory Status Producing | Start Up 2008 | ||||
| Imperial Oil | Cold Lake Phases 14-16:Nabiye, Mahihkan North | Cold Lake | In-Situ | N/A | 30,000 |
| Regulatory Status Approved | Start Up TBD | ||||
| Korea National Oil Corporation | Black Gold | Athabasca | In-Situ | $350M | 10,000 |
| Regulatory Status Regulatory Application Filed | Start Up 2012 | ||||
| Korea National Oil Corporation | Black Gold Phase 2 | Athabasca | In-Situ | N/A | 20,000 |
| Regulatory Status Announced | Start Up TBD | ||||
| Laricina Energy | Germain Phase 1 | Athabasca | In-Situ | N/A | 10,000 |
| Regulatory Status Announced | Start Up TBD | ||||
| Laricina Energy | Saleski In Situ - Carbonate SAGD Demonstration | Athabasca | In-Situ | N/A | 1,800 |
| Regulatory Status ERCB Approved | Start Up 2010 | ||||
| MEG Energy Corp. | Christina Lake Regional Project Phase 3C | Athabasca | In-Situ | N/A | 50,000 |
| Regulatory Status Regulatory Application Filed | Start Up 2018 | ||||
| MEG Energy Corp. | Christina Lake Regional Project Phase 3A | Athabasca | In-Situ | $6,475M Ph. 2B-3C | 75,000 |
| Regulatory Status Regulatory Application Filed | Start Up 2014 | ||||
| MEG Energy Corp. | Christina Lake Regional Project Phase 3B | Athabasca | In-Situ | $6,475M Ph. 2B-3C | 50,000 |
| Regulatory Status Regulatory Application Filed | Start Up 2017 | ||||
| Nexen Inc. | Long Lake Phase II | Athabasca | In-Situ | $5,950M | 72,000 |
| Regulatory Status ERCB Approved | Start Up TBD | ||||
| Nexen Inc. | Long Lake Phase I | Athabasca | In-Situ | N/A | 72,000 |
| Regulatory Status Producing | Start Up 2008 | ||||
| Nexen Inc. | Long Lake Phases 4-6 | Athabasca | In-Situ | N/A | 216,000 |
| Regulatory Status Announced | Start Up TBD | ||||
| North Peace Energy | Red Earth CSS Pilot | Peace River | In-Situ | N/A | 1,001 |
| Regulatory Status Producing | Start Up 2009 | ||||
| North Peace Energy | Red Earth Expansion | Peace River | In-Situ | N/A | 3,000 |
| Regulatory Status Announced | Start Up TBD | ||||
| Osum Oil Sands Corp | Taiga | Cold Lake | In-Situ | N/A | 35,000 |
| Regulatory Status Regulatory Application Filed | Start Up 2013 | ||||
| Petrobank Energy & Resources Ltd. | May River Expansion | Athabasca | In-Situ | $3,150M | 90,000 |
| Regulatory Status Public Disclosure Made | Start Up TBD | ||||
| Petrobank Energy & Resources Ltd. | May River Phase I | Athabasca | In-Situ | $350M | 10,000 |
| Regulatory Status Regulatory Application Filed | Start Up 2014 | ||||
| Petrobank Energy & Resources Ltd. | Whitesands-Expansion | Athabasca | In-Situ | N/A | 1,900 |
| Regulatory Status Approved | Start Up 2011 | ||||
| Pengrowth Energy Trust | Lindbergh Pilot | Cold Lake | In-Situ | N/A | 2,500 |
| Regulatory Status Regulatory Application Filed | Start Up TBD | ||||
| Shell Canada Energy | Orion Phase 2 | Cold Lake | In-Situ | N/A | 10,000 |
| Regulatory Status ERCB Approved | Start Up TBD | ||||
| Suncor Energy Inc. | MacKay River Phase 2 | Athabasca | In-Situ | $1,400M | 40,000 |
| Regulatory Status ERCB Approved (Delayed) | Start Up TBD | ||||
| Suncor Energy Inc. | MacKay River Phase 1 | Athabasca | In-Situ | N/A | 33,000 |
| Regulatory Status Producing | Start Up 2002 | ||||
| Suncor Energy Inc. | Chard | Athabasca | In-Situ | N/A | 40,000 |
| Regulatory Status Announced | Start Up TBA | ||||
| Statoil Canada Ltd. | Kai Kos Dehseh - Leismer Expansion | Athabasca | In-Situ | $8,050M | 40,000 |
| Regulatory Status Regulatory Application Filed | Start Up 2012-2014 | ||||
| Statoil Canada Ltd. | Kai Kos Dehseh - Commercial Project | Athabasca | In-Situ | N/A | 200,000 |
| Regulatory Status Regulatory Application Filed | Start Up 2012-2034 | ||||
| Value Creation | Terre de Grace Pilot | Athabasca | In-Situ | N/A | 10,000 |
| Regulatory Status Regulatory Application Filed | Start Up TBD | ||||
| Value Creation | Terre de Grace Phases 1&2 | Athabasca | In-Situ | N/A | 80,000 |
| Regulatory Status Public Disclosure Made | Start Up TBD | ||||
| Suncor Energy Inc. | Meadow Creek Phase 2 | Athabasca | In-Situ | N/A | 40,000 |
| Regulatory Status Approved | Start Up TBD | ||||